Through collaboration between Akenerji, Akiş, and Akyaşam, two Solar Power Plants (SPP) for self-consumption have been installed on the rooftops of Akasya Mall and Akbatı Mall under the Unlicensed Electricity Generation Regulation. The project encompasses panel assembly, inverter installation, commissioning, maintenance, and operations. The installations have capacities of 724 kWp (Akasya) and 821 kWp (Akbatı) respectively.
The project is expected to generate a total of 1,500,000 kWh annually, enabling the malls to meet 12% of their common area electricity consumption through renewable energy sources.
Akenerji, Akiş GYO, Akyaşam
Design and Construction EPC